In order to comply with the The Heating Company Warranty,
the following Site Instructions must be adhered to:
Customer and Builder
- All floors must be suitable for tile laying. They
must be firm, level, clean and free from cracks, holes or
sharp protrusions.
- Wooden floors must be covered with Hardy's Tile &
Slate underlay, in accordance with the manufacturers
fixing instructions.
- Precautions should be taken to prevent people from walking
or working on the floor once the elements have been installed
(until tiles have been laid).
Precautions must be taken to protect the elements against
damage if there is going to be a delay in tile laying.
- Where elements are being laid on top of wooden floors
a Floor Sensing Type Thermostat is required to conform
to Carters Kopine and Fletchers Permafloor warranty.
If using a different type of timber flooring please contact
the supplier regarding suitability for the use of heating.
- No allowance has been made to heat shower cavities or
under fixed furniture etc.
Electrician
- Wiring must be in place before heating can be installed.
Allowance must be made for extra heat load as stated on
the customer's quotation. Please refer to wiring
instructions supplied with customer quotation.
- Supply and install one flush box Vertically for
each thermostat.
- Supply and install a draw wire from the flush box down
to the floor level as per wiring diagram.
- Supply and install sub circuit wiring to each thermostat
- Should be RCD circuit breaker protected.
Tiler
- It is the Tiler's responsibility to check the floor for
suitability for tiling and to do any floor preparation,
waterproofing etc required before the heating is installed.
- A good quality primer must be applied over the The
Heating Company screed covering the heated floor before
tiling.
- Only flexible adhesives should be used. We recommend a
10mm minimum, notched trowel to be used to spread
adhesive. Check trowel - any sharp edges should be removed.
- Do not position tile cutting or other machinery
on the heated floor. Care must be taken not to drop anything.
- Only clean, soft-soled shoes should be worn. Keep others
off the floor until tiling is finished.
Note: If any damage occurs while tiling. STOP
IMMEDIATELY and contact the The Heating Company Dealer.
General: To ensure a prompt service
please allow three weeks from the time of order to installation,
however we are often able to supply in shorter lead times, if
required.
|