Under Tile Heating
Under Carpet Heating
Hydronic Water System
Ventilation & Moisture Removal
Fujitsu Heat Pumps
Heat-ON Radiant Ceiling Heating
In-Concrete Heating
Heated Towel Rails
Mirror Demisters
Thermostats
Central Vacuuming
 





Mirror Demisters Installation Instructions
Installation Instructions

Note

  • The heating element is double insulated, eliminating the need for an earth connection.
  • The optimum temperature is 36°C, therefore a transformer or thermostat is not required.
1. Take a power feed from a light circuit or separate electrical circuit, exiting the wall where the mirror is mounted.
2. Peel back the self-adhesive cover from either the top or the corner of the demister, gently smoothing it to the back of the mirror as you peel it off. Ensure it is completely flat once all the backing has been removed.
3. Line up the power feed with the heater cold tail so the connection does not protrude from the wall.
4. The mirror can be screwed, glued or mounted in a frame.
5. The demister can be placed on either the back of the mirror or directly onto the wall.
* DO NOT SCREW THROUGH THE HEATER AND ALLOW FOR EVEN CLEARANCE FROM THE WALL

 

 

| Home | Under Tile Heating | Under Carpet Heating | Fujitsu Air Conditioners | DIY Set Mats | Mirror Demisters | In-Concrete Heating | Horticultural Heating |
| Panel Heaters | Radiance Heated Towel Rails | Company Profile | Product History | NZ Dealers | International Dealers | Contact Us |